Environmental Management Services

Services Offered

1. Environmental Impact Assessment (EIA)/ Environmental Management Plan (EMP) studies for Coal Projects & Coal Beneficiation Plant to obtain Environment Clearance from Ministry of Environment & Forests.

The studies undertaken & covered in the EIA/EMP are:
A. Baseline data generation covering recording of meteorological data, measurement of ambient air & water quality, noise level, soil quality, study of land use, flora & fauna and social status of population in core & buffer zone.

B. Impact Assessment and Management Plan
This includes assessment of impact due to mining on land, air, water and noise levels, hydro-geologic regime, flora & fauna and on the society. Planning of suitable measures to reduce the environmental impact and improve the local environment through air, water & noise abatement measures, land reclamation, green belt development, rehabilitation and resettlement (R&R), subsidence management, waste management, and ecological restoration are also covered. More than 400 EIA/EMP studies covering opencast and underground coal/mineral mines including coal & mineral beneficiation plants have been completed of which environmental clearance of more than 350 have been accorded by Ministry of Environment & Forests. This include EIA/EMP of coal projects of 35 MTY, pyrite mines, rare earth, gypsum and bauxite mines.

Regional Environmental Studies
Regional EIA study for coalfields covering mines and other industries has also been prepared for Ib Valley Coalfield, Wardha Valley Coalfield and East Bokaro Coalfield.

2. Environmental Monitoring
The Environmental Monitoring of mining projects and coal beneficiation plants are undertaken through experienced & trained personnel in sampling & analysis for compliance of statutory directives of Ministry of Environment & Forests, Government of India and State Pollution Control Boards. Environment laboratory of CMPDI (Hq) is recognized by Central Pollution Control Board.

3. Environmental Statement and Mine Closure Plan
Annual environmental statement of different coal mining projects and Mine Closure Plan (MCP) for safe and sustainable closure of the mines in terms of guidelines issued by Ministry of Coal, Government of India are undertaken on regular basis.

4. Slope Stability and Soil Conservation Studies
Slope Stability Analysis of OB dumps (both external & internal) is another area of service rendered through well established Slope Stability Cell at HQ. Soil Conservation & Management Plans are also undertaken for compliance of forestry clearance requirement.
Some of the projects undertaken in the past include slope stability study for Bhurkunda Opencast Project of Central Coalfields Limited (CCL), Jayant OCP, NCL and soil erosion study of Karma, Topa, Urimari and Tapin North Opencast projects of CCL.

5. Engineering Services
Services for planning & design of industrial as well as domestic effluent treatment plants, water supply distribution network and water treatment facilities are provided even to the outside clients. Some of the planned & designed treatment plants are Ledo acid mine drainage, NEC Nigahi, Jayant and Krishnashila Project of NCL, Kathara washery of CCL and domestic waste water of Regional Telecom Training Centre, BSNL, Ranchi amongst others. The ground water studies for mines in association with the experienced team of Hydro-geology Cell are also undertaken.

6. Land Use Planning
Environment Department, in association with Remote Sensing Cell of Geomatics Department, undertakes land use studies through satellite imagery techniques for the project as well as for urban and regional planning.

7. Rain Water Harvesting
Roof top rain water harvesting schemes are also planned for conservation / augmentation of precious ground water resource.