891 |
2017_CMPDI_77140_1 |
Hiring commercial vehicles on ???As and When Required??? basis for use of Central Mine Planning and Design Institute Limited (CMPDI), Ranchi, for a period of one year extendable up to another three months, if required |
Notification |
09-10-2017 |
21-10-2017 |
23-10-2017 |
892 |
CMPDI/RI-II/Binding/17-18/Ext.-1/3233-43 Date: 17.10.17 |
Annual Rate Contract for Binding work with supply of materials required for binding at CMPDI, RI-II, Dhanbad, Koyla Bhawan Complex, Koyla Nagar, Dhanbad |
Download |
05-10-2017 |
18-10-2017 |
20-10-2017 |
893 |
CMPDI/RI-VII/BBSR/CIVIL/e-T/2017/50/E98809 Dtd: 06.10.2017 |
Annual Maintenance Contract for housekeeping works at CMPDI Office Building, Bhubaneswar |
Download |
07-10-2017 |
17-10-2017 |
18-10-2017 |
894 |
CMPDI/RI-I/SandP/Env. & Blasting instruments/116&112/17-18/373 dtd 29.9.2017 |
Supply, lnstallation, Testing & CommissioninS of lnstruments / Equipment for Environmental Laboratory & Blasting Cell at CMPDI, Rl-1, Asansol |
Download |
26-09-2017 |
17-10-2017 |
17-10-2017 |
895 |
39 of 2017-18 dt. 03.10.2017 |
Supply, laying and termination of DG power cable at CMPDI campus, Ranchi. |
Download |
06-10-2017 |
16-10-2017 |
17-10-2017 |
896 |
40 of 2017-18 dt. 03.10.2017 |
Annual Maintenance Contract of 103 nos. Voltas make AC (52 nos. 2 Te. Split, 16 nos. 1.5 Te. Split and 35 nos. 1.5 Te. Window AC) at CMPDI (HQ), Ranchi. |
Download |
06-10-2017 |
16-10-2017 |
17-10-2017 |
897 |
CMPDI/RI7/ENM/GPLCamp/AMC/2017-18/1470DATED-22.09.2017 |
Up keeping & maintenance of all the electrical installations at CMPDI Exploration Camp Gopalpur, Odisha |
Download |
03-10-2017 |
16-10-2017 |
21-10-2017 |
898 |
CMPDI/RI-VII/Pur/17-18/1489DATED-25/09/2017 |
Supply and Installation of 04 nos of 2Tonne Split AC at CMPDI, RI-VII, Bhubaneswar. |
Download |
27-09-2017 |
16-10-2017 |
17-10-2017 |
899 |
CMPDI/RI-VII/Pur/17-18/1489DATED-25/09/2017 |
Supply and Installation of 04 nos of 2Tonne Split AC at CMPDI, RI-VII, Bhubaneswar. |
Download |
27-09-2017 |
16-10-2017 |
17-10-2017 |
900 |
??????.??????.??????.??????.??????/??????.??????-2/?????? ????????? ?????????/17-18/3041-51 Date: 05/10/2017 |
Supply ,Installation & wiring after making suitable holes for fixing of 450 mm / 300 mm Dia Exhaust fans in CMPDI RI-II office building. |
Download |
05-10-2017 |
15-10-2017 |
16-10-2017 |